If you are notified of work beginning on your street, we encourage you to file a USPS Hold Mail request. You can indicate that you will pick-up your mail at the post office or have the postman deliver after a specific date. https://www.usps.com/manage/hold-mail.htm Keep in mind that construction dates require flexibility and patience as weather and heavy equipment failures force dates to not meet expectations.
Your HOA dues are hard at work in Fenwick Gated. The majority of dues each year is allocated to various roadwork activities. We perform crack-repair street improvement projects, as well as resurfacing or replacing sections of the roadway. Every bit of road is affected in one phase or another which may unfortunately block access to your driveways.
Orange traffic cones will indicate areas of fresh repair that should be avoided by vehicular traffic. Our streets should remain semi-passable throughout the repairs. A friendly HOA volunteer will try to make sure you are aware within a day or two of your driveway being blocked.
If your sprinkler system runs onto and down our streets, please turn it off temporarily while the repairs are being made. Moisture on fresh asphalt causes structural damage to the roads and has adverse effects on the repairs settling as needed. You may also notice equipment parked along certain streets overnight as the crew work on repairs.
If you must park on the road overnight because your driveway is blocked, please remove your valuables and garage remotes, and be sure to lock your car doors. We rarely have vehicle break-ins in the neighborhood, but you can never be too safe.
We greatly appreciate your patience and cooperation.
Fenwick Gated HOA Board
10-Nov 2021: Your HOA dues are going to be hard at work over the next 4 to 6 weeks as we begin a significant crack-repair street improvement project. Orange traffic cones will indicate areas of fresh repair that should be avoided by vehicular traffic. Our streets should remain passable throughout the repairs. Someone from the road crew should notify you in advance if access to your driveway will become impaired.
If your sprinkler system runs onto and down our streets, please turn it off temporarily while the repairs are being made. Moisture on fresh asphalt will have adverse effects on the repairs settling as needed. You may also notice equipment parked along certain streets overnight as the crew work on repairs.
We all greatly appreciate your patience and cooperation. We apologize for the late notice as the road crew finished another project much earlier than expected.
Fenwick Gated HOA Board